Gembloux Solar Park
Project details
Location: Gembloux
Capacity: 6 MW
Grid Operator: ORES
Commissioning: Summer 2025 (planned)
HOP is supporting the realisation of the solar park in Gembloux.
We designed the electrical layout, performed the cable calculations, and provide weekly site inspections. In close coordination with ORES, we configured the RTU and aligned the disconnection relay logic with the park’s PLC, ensuring smooth interaction with the grid.